Hotel |
Remark: Ice water pump oprates under lower load for a longer time period then estimated |
Installation time: Aug. 2015 Project scope:Hostel building air conditioning chiller and ice water pump Model:VR 2 units Power supply:3ψ/380V/60Hz Method:Inverter stepless frequency control, constant temperature control Photos |
KTV Business building |
Remark: Load varied based on customer traffic, average load lower then original estimation |
Installation time:July 2014 Project scope:Air-con compressor supply to all private rooms air conditioning– 20HP Mitsubishi compressor Model:VR series x 1 Power supply:3Φ/220V/60Hz Method:compressor VF control, constant refrigerant pressure mode Installation agent:Taiwan ForeverPower Tech. Co., Ltd. Photos |
Fast Food Restaurant Catering |
Remark: Kitchen area air conditioner compressor works high load constantly for a long time |
Installation time:May 2014 Project scope:Air-con compressor supply to kitchen and dining area air conditioning – 20HP Copeland compressor Model:SES-VR series x 4 Power supply:3Φ / 380V / 60Hz Method:compressor VF control, constant refrigerant pressure mode Installation agent:Taiwan ForeverPower Tech. Co., Ltd. Photos |
桃園俱樂部 Hotel |
Remark: Load varied based on customer traffic, average load lower then original estimation |
Installation time:April 2014 Project scope: Ice water pumps to provide air conditioning to whole establishment – 1.5HP TECO motor pump Model:SES-VR series x 4 Power supply:3Φ / 380V / 60Hz Method:motor VF control, constant water temperature mode Installation agent:Taiwan ForeverPower Tech. Co., Ltd. Photos |
飯店 Hotel |
Remark: Actual saving rate matchs estimate saving range |
Installation time:April 2014 Project scope:Ice water pump, cooling water pump, cooling tower pump and supply to related pumps for air conditioning for main building –7.5HP, 20HP, 25HP TECO motor pump Model:SES-VR series x 3 Power supply:3Φ / 220V / 60Hz Method:motor VF control, constant water temperature mode Installation agent:Taiwan ForeverPower Tech. Co., Ltd. Photos |
l Hotel |
Remark: Load varied based on customer traffic, average load lower then original estimation |
Installation time:February 2014 Project scope:Ice water circulation system, water-cooling pump related main building air conditioning –25HP TECO motor pump Model:SES-VR series x 2 Power supply:3Φ / 380V / 60Hz Method:motor VF control, constant water temperature mode Installation agent:Taiwan ForeverPower Tech. Co., Ltd. Photos |
商旅 Hotel |
Remark: Load varied based on customer traffic, average load lower then original estimation |
Installation time:February 2014 Project scope:Ice water pump, zone pump, water-cooling pump related to main building air conditioning –5HP, 7.5HP TECO motor pump Model:SES-VR series x 3 Power supply:3Φ / 220V / 60Hz Method:motor VF control, constant water temperature mode Installation agent:Taiwan ForeverPower Tech. Co., Ltd. Photos |
會館 Catering |
Remark: Load varied based on customer traffic, average load lower then original estimation |
Installation time:December 2013 Project scope:Ice water pump, zone pump, water-cooling pump related to main building air conditioning – 15HP TECO motor pump Model:SES-VR series x 4 Power supply:3Φ / 380V / 60Hz Method:motor VF control, temperature differential mode Installation agent:Taiwan ForeverPower Tech. Co., Ltd Photos |
China Hotel Hotel |
Remark: Load varied based on customer traffic, average load lower then original estimation |
Installation time:June 2013 Project scope:Air-con compressor to provide air-conditioning to whole establishment –15HP Copeland scroll compressor Model:SES-VR series x 8 Power supply:3Φ / 380V / 50Hz Method:motor VF control, constant-pressure mode Installation agent:Guangzhou Jincheng Electronic Technology Co., Ltd. Related documentation:Energy saving efficiency certificate Photos |
上海外灘酒店 Hotel |
Remark: Load varied based on customer traffic, average load lower then original estimation |
Installation time: Project scope: Model: Power supply: Method: Photos |
PASTA & PIZZA Catering |
Remark: Actual saving rate matchs estimate saving range |
Installation time:December 2012 Project scope:Air-cooled air con unit to provide air-conditioning for kitchen – 7.5HP Copeland scroll compressor Model:SES-VR series x 1 Power supply:3Φ / 220V / 60Hz Method:motor VF control, constant-temperature mode Installation agent:Taiwan ForeverPower Tech. Co., Ltd Photos |
Taoyuan Hotel Hotel |
Remark: Load varied based on customer traffic, average load lower then original estimation |
Installation time:April 2012 Project scope:Cooling pump to provide heat dissipation for air conditioning unit – water cooling pump and cafeteria area – 40HP TECO motor pump and 10HP Copeland scroll compressor Model:SES-VR series x 3 Power supply:3Φ / 380V / 60Hz 3Φ/220V/60Hz Method:motor and compressor VF control, constant temperature mode Photos |
Hotel Hotel |
Evaluation report estimation saving rate : 30%±5% After installation Actual saving rate : 35%~47% Remark: Load varied based on customer traffic, average load lower then original estimation caused saving rate is higher about 5%~17%. |
Installation time:January 2012 (Testing completed) Project scope:Ice water circulating pump for air conditioning for main building – 25HP TECO Motor pump Model:VR series x 1 Power supply:3Φ / 380V / 60Hz Method:motor variable frequency control, constant temperature mode Installation agent:Solarienne Co., Ltd. Photos |
Hotel Hotel |
Remark: Actual saving rate matchs estimate saving range |
Installation time:June 2011 Project scope:Ice water pump, water-cooling pump related to main water chiller for main building air conditioning –20HP TECO motor pump Model:VR series x 2 Power supply:3Φ / 380V / 60Hz Method:motor VF control, constant water temperature mode Installation agent:Solarienne Co., Ltd Photos |
hotel Hotel |
Evaluation report estimation saving rate : 30%±5% After installation Actual saving rate : 35%~45% Remark: Load varied based on customer traffic, average load lower then original estimation caused saving rate is higher about 5%~15%. |
Installation time:April 2011 Project scope:Ice water pump, water-cooling pump related to main water chiller for main building air conditioning –7.5HP, 20HP TECO motor pump Model:VR series x 2 Power supply:3Φ / 380V / 60Hz Method:motor VF control, constant pressure mode Installation agent:Solarienne Co., Ltd Photos |
|
|