繁體中文 / English

Hotel
Remark:
Ice water pump oprates under lower load for a longer time period then estimated 
Installation time: Aug. 2015
Project scope:Hostel building air conditioning chiller and ice water pump
Model:VR 2 units
Power supply:3ψ/380V/60Hz
Method:Inverter stepless frequency control, constant temperature control
Photos
KTV
Business building
Remark:
Load varied based on customer traffic, average load lower then original estimation 
Installation time:July 2014
Project scope:Air-con compressor supply to all private rooms air conditioning– 20HP Mitsubishi compressor
Model:VR series x 1
Power supply:3Φ/220V/60Hz
Method:compressor VF control, constant refrigerant pressure mode
Installation agent:Taiwan ForeverPower Tech. Co., Ltd.
Photos
Fast Food Restaurant
Catering
Remark:
Kitchen area air conditioner compressor works high load constantly for a long time
Installation time:May 2014
Project scope:Air-con compressor supply to kitchen and dining area air conditioning – 20HP Copeland compressor
Model:SES-VR series x 4
Power supply:3Φ / 380V / 60Hz
Method:compressor VF control, constant refrigerant pressure mode
Installation agent:Taiwan ForeverPower Tech. Co., Ltd.
Photos
桃園俱樂部
Hotel
Remark:
Load varied based on customer traffic, average load lower then original estimation 
Installation time:April 2014
Project scope: Ice water pumps to provide air conditioning to whole establishment – 1.5HP TECO motor pump
Model:SES-VR series x 4
Power supply:3Φ / 380V / 60Hz
Method:motor VF control, constant water temperature mode
Installation agent:Taiwan ForeverPower Tech. Co., Ltd.
Photos
飯店
Hotel
Remark:
Actual saving rate matchs estimate saving range
Installation time:April 2014
Project scope:Ice water pump, cooling water pump, cooling tower pump and supply to related pumps for air conditioning for main building –7.5HP, 20HP, 25HP TECO motor pump
Model:SES-VR series x 3
Power supply:3Φ / 220V / 60Hz
Method:motor VF control, constant water temperature mode
Installation agent:Taiwan ForeverPower Tech. Co., Ltd.
Photos
l
Hotel
Remark:
Load varied based on customer traffic, average load lower then original estimation
Installation time:February 2014
Project scope:Ice water circulation system, water-cooling pump related main building air conditioning –25HP TECO motor pump
Model:SES-VR series x 2
Power supply:3Φ / 380V / 60Hz
Method:motor VF control, constant water temperature mode
Installation agent:Taiwan ForeverPower Tech. Co., Ltd.
Photos
商旅
Hotel
Remark:
Load varied based on customer traffic, average load lower then original estimation
Installation time:February 2014
Project scope:Ice water pump, zone pump, water-cooling pump related to main building air conditioning –5HP, 7.5HP TECO motor pump
Model:SES-VR series x 3
Power supply:3Φ / 220V / 60Hz
Method:motor VF control, constant water temperature mode
Installation agent:Taiwan ForeverPower Tech. Co., Ltd.
Photos
會館
Catering
Remark:
Load varied based on customer traffic, average load lower then original estimation 
Installation time:December 2013
Project scope:Ice water pump, zone pump, water-cooling pump related to main building air conditioning – 15HP TECO motor pump
Model:SES-VR series x 4
Power supply:3Φ / 380V / 60Hz
Method:motor VF control, temperature differential mode
Installation agent:Taiwan ForeverPower Tech. Co., Ltd
Photos
China Hotel
Hotel
Remark:
Load varied based on customer traffic, average load lower then original estimation 
Installation time:June 2013
Project scope:Air-con compressor to provide air-conditioning to whole establishment –15HP Copeland scroll compressor
Model:SES-VR series x 8
Power supply:3Φ / 380V / 50Hz
Method:motor VF control, constant-pressure mode
Installation agent:Guangzhou Jincheng Electronic Technology Co., Ltd.
Related documentation:Energy saving efficiency certificate
Photos
上海外灘酒店
Hotel
Remark:
Load varied based on customer traffic, average load lower then original estimation 
Installation time:
Project scope:
Model:
Power supply:
Method:
Photos
PASTA & PIZZA
Catering
Remark:
Actual saving rate matchs estimate saving range
Installation time:December 2012
Project scope:Air-cooled air con unit to provide air-conditioning for kitchen – 7.5HP Copeland scroll compressor
Model:SES-VR series x 1
Power supply:3Φ / 220V / 60Hz
Method:motor VF control, constant-temperature mode
Installation agent:Taiwan ForeverPower Tech. Co., Ltd
Photos
Taoyuan Hotel
Hotel
Remark:
Load varied based on customer traffic, average load lower then original estimation 
Installation time:April 2012
Project scope:Cooling pump to provide heat dissipation for air conditioning unit – water cooling pump and cafeteria area – 40HP TECO motor pump and 10HP Copeland scroll compressor
Model:SES-VR series x 3
Power supply:3Φ / 380V / 60Hz 3Φ/220V/60Hz
Method:motor and compressor VF control, constant temperature mode
Photos
Hotel
Hotel
Evaluation report estimation saving rate : 30%±5% 
After installation Actual saving rate : 35%~47%
Remark:
Load varied based on customer traffic, average load lower then original estimation caused saving rate is higher about 5%~17%.
Installation time:January 2012 (Testing completed)
Project scope:Ice water circulating pump for air conditioning for main building – 25HP TECO Motor pump
Model:VR series x 1
Power supply:3Φ / 380V / 60Hz
Method:motor variable frequency control, constant temperature mode
Installation agent:Solarienne Co., Ltd.
Photos
Hotel
Hotel
Remark:
Actual saving rate matchs estimate saving range
Installation time:June 2011
Project scope:Ice water pump, water-cooling pump related to main water chiller for main building air conditioning –20HP TECO motor pump
Model:VR series x 2
Power supply:3Φ / 380V / 60Hz
Method:motor VF control, constant water temperature mode
Installation agent:Solarienne Co., Ltd
Photos
hotel
Hotel
Evaluation report estimation saving rate : 30%±5% 
After installation Actual saving rate : 35%~45%
Remark:
Load varied based on customer traffic, average load lower then original estimation caused saving rate is higher about 5%~15%.
Installation time:April 2011
Project scope:Ice water pump, water-cooling pump related to main water chiller for main building air conditioning –7.5HP, 20HP TECO motor pump
Model:VR series x 2
Power supply:3Φ / 380V / 60Hz
Method:motor VF control, constant pressure mode
Installation agent:Solarienne Co., Ltd
Photos
        
VISIT US
5F, No. 1, Alley 37, Shuangcheng St., Zhongshan District, Taipei City, Taiwan R.O.C.
CALL
Tel: 02-2587-2582
Fax:02-2587-2570